Completed bathroom remodel — tiled and fitted, Hertfordshire

Bathroom Remodelling

From a straightforward restyle to a full wet room conversion, MJD handles bathroom projects of all sizes. We coordinate every trade in-house — plumbing, tiling, electrics, carpentry, and decoration — so you have one team responsible for the whole job from start to finish. The result is a bathroom that's properly waterproofed, properly finished, and built to last.

What to Expect

  1. Survey & Design Consultation

    We visit, measure up, and talk through what you want. We'll advise on layout options, materials, and any structural changes that might improve the space. Our quote covers all labour and work end-to-end — no surprises when trades turn up.

  2. Strip-Out & Preparation

    The old bathroom is removed and the room is properly tanked (waterproofed) before any tiling begins. Plumbing and electrical points are repositioned as required. Getting the preparation right is what separates a bathroom that lasts from one that starts failing within a few years.

  3. Installation & Tiling

    Sanitaryware, shower enclosure or bath, vanity unit, heated towel rail, tiling, flooring, and all finishing details are fitted in the correct sequence by the right trades. Everything is done in-house — no waiting for a separate tiler.

  4. Test & Handover

    All pipework is pressure-tested, fittings are checked for leaks, and the room is thoroughly cleaned before handover. We won't sign off and leave until you're satisfied with every detail.

Projects We've Completed

Full Bathroom Remodel

Hertfordshire

Bathroom Remodel — March Project

Complete strip-out and refit of a family bathroom. New layout, full wall and floor tiling, walk-in shower, freestanding bath, and underfloor heating.

View Case Study

"Our bathroom had needed replacing for years but we kept putting it off. MJD made the whole process straightforward — one quote, one team, no drama. The tiling alone is worth writing about. It's the first room in the house you'd actually show off to a visitor."

Karen Full Bathroom Remodel — Essex

Bathroom Remodelling FAQs

How long does a bathroom remodel take?
A typical family bathroom remodel takes 7–12 working days. Wet rooms, larger en-suites, and bathrooms requiring significant structural changes take longer. We'll give you a specific programme when we quote — and work to minimise the time you're without a functioning bathroom.
Do you supply the sanitaryware, or do we source it ourselves?
Either works. You can supply your own tiles, sanitaryware, taps, shower tray, and fittings — or we can source them for you. Most clients prefer to choose tiles and sanitaryware in person (so they can see the actual finish) with us supplying fixings and materials.
Are the tiled areas properly waterproofed?
Yes — always. All wet areas are fully tanked (waterproofed with a dedicated membrane system) before any tiling begins. This is non-negotiable. Skipping tanking is the reason so many tiled bathrooms develop damp, failed grout, and structural damage within a few years of installation.
Do you do the tiling, or is that a separate contractor?
All tiling is done in-house by our own team. You don't need to find or coordinate a separate tiler — it's included in the package and managed as part of the overall programme.

Thinking about a bathroom remodelling?
Let's talk.

We'll visit your property, listen to what you want to achieve, and give you a clear written quote. No pressure, no obligation.

Email: info@mjdbuilds.com

We'll call back within one working day. No spam, no mailing lists.

Call Now
WhatsApp
Quote