Steve's Structural Steelwork
- Location
- Hertfordshire
- Category
- Renovations
- Duration
- 3 weeks
- Services
- Structural Steelwork · Renovations · Plastering
Multi-point structural steel installation enabling a complete open-plan ground floor reconfiguration.
The Brief
Steve's project involved removing several internal walls across the ground floor to create a contemporary open-plan layout. The structural complexity was significant — multiple steel beams at different levels, all coordinated with a structural engineer and building control. MJD managed the entire structural phase from temporary propping through to handover, with plasterwork and ceilings reinstated throughout.
Project Photos
"The structural work was done neatly and on schedule. MJD coordinated everything with the engineer — we didn't have to chase anyone."